BREMERHAVEN. In November, the Bremen Senate and the Port Committee gave the go-ahead to reinforce the Bremen Port Railway even further. The primary aim is to expand the staging capacity at Speckenbüttel station in Bremerhaven, i.e. the track systems on which trains can be assembled or “parked” for transport to or from the port. The entire project, costing around 56.1 million euros, is aimed at securing the efficiency of the port location on a long-term basis, while also supporting the ecological goals of port logistics.
Credits: bremenports